U.S. 34

This segment closed on May 28, 2019.  It reopened to limited traffic on June 28 between I-29 and the Nebraska Line. This traffic is running head to head in the westbound lanes due to high water. Drivers are told to expect intermittent lane closures for ongoing flood repairs to shoulders and ditches.

Note: The interchange at U.S. 34 is the last southbound exit on I-29 to offer services such as fuel for 60 miles, until the next available services in Rock Port, MO.

 

I-29 from U.S. 34 to Iowa 2

•  Intermittent lane closures may be necessary for repairs

•  Ramp repairs are underway

Limited mobility restored in this segment on June 18, 2019

 

I-29 from Iowa 2 to Missouri Line

•  Intermittent lane closures may be necessary for repairs

•  Ramp repairs are underway

Limited mobility restored in this segment on June 18, 2019.

 

Iowa 2 from I-29 to Nebraska Line

•  Culvert and ramp repairs are underway

TARGET – Limited mobility by the end of August 2019.

 

Iowa 333 and U.S. 275

TARGET – Undefined due to water over the roadway.

(0) comments

Welcome to the discussion.

Keep it Clean. Please avoid obscene, vulgar, lewd, racist or sexually-oriented language.
PLEASE TURN OFF YOUR CAPS LOCK.
Don't Threaten. Threats of harming another person will not be tolerated.
Be Truthful. Don't knowingly lie about anyone or anything.
Be Nice. No racism, sexism or any sort of -ism that is degrading to another person.
Be Proactive. Use the 'Report' link on each comment to let us know of abusive posts.
Share with Us. We'd love to hear eyewitness accounts, the history behind an article.